Water-based resin mortar
Product Application
Water-based Resin Mortar Coating Structure
Construction Technology
| Construction sequence | Construction process | Optional materials | Material quantity | Construction method |
| 1 | Base roadbed | Grinding | ||
| 2 | Primer layer | KS-302-1 water-based primer | Scraping | |
| 3 | Middle coating mortar layer | KS-303-5 water-based mid-coat | Scraping | |
| 4 | Putty layer | KS-404 water-based resin mortar | Troweling | |
| 5 | Water-based epoxy topcoat | KS-404 water-based resin mortar | Rolling |
| Process name | Specific practices and requirements |
| Base treatment | First, the base needs to be treated to ensure that it is dry, clean, and free of oil and loose materials. If there are cracks, they should be repaired first. |
| Base coating | Mix the primer material evenly according to the specified proportion, then apply it evenly on the base with a roller or scraper, and let it dry within the specified time. |
| Mortar layer | Mix the water-based polyurethane mortar material evenly according to the specified proportion, and then use a toothed scraper to evenly distribute it on the base to ensure that the entire floor is covered. Before the polyurethane mortar layer is completely dry, it needs to be polished and polished several times to ensure that the surface flatness and smoothness meet the requirements. |
| Middle coating | After the polyurethane mortar layer is completely dry, the middle coating can be constructed. Commonly used middle coating materials include polyurethane elastic coatings, epoxy resin coatings, etc. Mix the middle coating materials evenly according to the specified proportion, then apply them evenly on the polyurethane mortar layer with a roller or scraper, and let it dry within the specified time. |
| Top coating | After the middle coating is completely dry, the top coating can be constructed. Commonly used top coating materials include polyurethane elastic coatings, epoxy resin coatings, etc. Mix the topcoat materials evenly in the prescribed proportions, then use a sprayer to spray them on the ground and let them dry within the prescribed time. |
| Finishing treatment | After the construction is completed, the ground needs to be cleaned and maintained. It is recommended to cover and protect the ground within 24 hours of completion to avoid external pollution and damage. |
Color Customization
Finished Product Maintenance
·After the construction of the water-based floor is completed, it needs to be cured for 7-10 days before it can be put into use. During the curing period, water or other solutions should be avoided from soaking the surface.
·It is recommended that personnel entering the workshop change into rubber-soled shoes to avoid bringing mud and sand from outside into the workshop and scratching the floor.
·For hardware such as iron chairs, iron tables, iron shelves, etc., it is recommended to wrap their feet with soft plastic or rubber to avoid scratching the floor during use.
·The forklift needs to fully lift the pallet off the ground. Please pay special attention to the pallet corners when turning, and do not scratch the floor.
·Please use a soft mop or a wet and dry vacuum cleaner to clean the floor. It can be cleaned with clean water or detergent.
·Before the equipment enters the factory, it is recommended to lay a hard cardboard box as a bottom to avoid scratching the floor during transportation of the equipment.
·Please use hard or elastic rubber wheels for the wheels of carts and pallets. It is recommended to use them separately inside and outside the factory.